OK ERFO NP CHIC 2024-1(1) Veterans Lake Trail Bridge
Procurement Office | FHWA - Central Federal Lands Highway Division |
---|---|
Procurement Category | Construction |
Contract Awarded | No |
Estimated Value | $2 million to $5 million |
Competition Type | To be determined |
RFP Quarter | 2nd QTR |
Fiscal Year | |
NAICS | 237 310 |
Sequence Number | 2025-209 |
Description | Constructing the new bridge includes repairing the existing abutments that would be reused to support the replacement bridge, repairing the minor masonry structure, and installing an approximately 130-foot-long and 6-foot-wide prefabricated pedestrian bridge. The replacement bridge would be a prefabricated steel truss bridge with a timber deck, similar in appearance to the original structure. Removal of the existing bridge from Veterans Lake would likely involve floating the structure to the parking lots on the east side of the lake and lifting it via crane. The bridge would then be appropriately disposed of. |
Contact Name | Laura Vallejos |
CFLacquisitions@dot.gov | |
Phone | (720) 963-3638 |
Is this a follow-on to a current 8(a) contract? | No |
Expected Period of Performance | - |
Place of Performance |
|
Personnel Clearance Requirements | No |
Action/Award Type | N/A |
Anticipated Award Date |
Date Modified: