Procurement Forecast Opportunity-670266-2025-030
Road, Highway, and/or Bridge Construction Project. Work includes roadway embankment, paving, and striping.
Road, Highway, and/or Bridge Construction Project. Work includes roadway embankment, paving, and striping.
OST-M11-2024-01 - Mentoring Program - Web-Based Mentoring for Office of the Secretary (OST) Employees
FOIAXpress software licenses and maintenance.
The project proposes to rehabilitate up to 15.20 miles of Mineral King Road located within Sequoia and Kings Canyon National Park (SEKI). The project is located east of Visalia in Tulare County, CA
The objective is to provide the support services for research and technology transition services. Research transition services include conducting market assessment of the state-of-the-practice, identifying gaps needed to further the subject, identification of key stakeholders, and potential challenges.
Road, Highway, and/or Bridge Construction Project. The proposed contract action is for a firm-fixed-priced construction contract. The primary objective of the proposed construction project is full depth reclamation and asphalt surfacing for the parking area and trail at Sportsman's Park. Other items of work include striping and minor drainage. The project is located approximately 3 miles E.
Reconstruct 4.5 miles of roadway. Work consists of apshpalt concrete paving, aggregate base, grading, draininage, MSE wall, and Bridge railing.
The National Center for Statistics and Analysis (NCSA) is responsible for providing a wide range of analytical and statistical support to NHTSA and the highway safety community at large. NCSA collects data on police-reported motor vehicle traffic crashes in the U.S.
OST-M90-2024-01 - Mail Services - This is a follow on contract for mail services and small package/parcel delivery services utilizing a mandatory source contract with AbilityOne at the Department of Transportation (DOT) and Federal Aviation Administration (FAA) headquarters building.
The project consists of installation of a sidewalk adjacent the existing roadway from the intersection of Kuhio Highway to the KPNWR Overlook. Work includes pavement rehabilitation and resurfacing of the existing roadway, with full depth pavement on aggregate base course for roadway widening segments, and reconstruction of the existing turnaround.