Procurement Forecast Opportunity-467556-2024-091
Repair storm and flood damage on multiple roads and trails. Includes bridge replacement and slides.
Repair storm and flood damage on multiple roads and trails. Includes bridge replacement and slides.
The scope of the project consists of reconstruction and addition of new lanes for a continuous four-lane roadway consisting of two lanes in each direction for an approximate distance of 4,275 ft. (0.81 mi), safety improvements, reconstruction of pedestrian, and drainage facilities to support the widening. Limits of the project is from west of Kronprindsens Tvaer Gade to west of Hospital Gade.
This is a design build construction project for landslide repairs in the North and South regions C1.
Add one additional EB driving lane on Hickory Hill Road from 0.25 miles East of Jamestown Drive to Mahone Avenue.
This is a design build construction project.
Landslide repairs in the West Region.
Landslide repairs in Ciales.
Construct ramp and two additional exit lanes for access to Hatfield Gate from NB Washington Blvd.
The purpose of the MO ERFO NPS OZAR 2020-1(1) project is to repair the Cave Trail Bridge at Round Spring Cave Trail and to reconstruct the low water crossing and the asphalt concrete approaches at Valley Road Bridge.
Raphune Hill Road and Route 381 intersection improvements - Contract 2