Action
Final rule.
Summary
The FAA is adopting a new airworthiness directive (AD) for certain General Electric Company (GE) Model GEnx-1B64, GEnx-1B64/P1, GEnx-1B64/P2, GEnx-1B67, GEnx-1B67/P1, GEnx-1B67/P2, GEnx-1B70, GEnx- 1B70/75/P1, GEnx-1B70/75/P2, GEnx-1B70/P1, GEnx-1B70/P2, GEnx-1B70C/P1, GEnx-1B70C/P2, GEnx-1B74/75/P1, GEnx-1B74/75/P2, GEnx-1B76/P2, GEnx- 1B76A/P2, GEnx-2B67, GEnx-2B67B, and GEnx-2B67/P engines. This AD was prompted by a report of a fuel leak caused by a defective fuel tube hose connecting the main fuel-oil heat exchanger. This AD requires removal of all affected fuel tube hoses from service and replacement with parts eligible for installation. The FAA is issuing this AD to address the unsafe condition on these products.