Action
Notice of proposed rulemaking (NPRM).
Summary
This NPRM proposes to allow operators of hazardous liquid and carbon dioxide pipelines to determine a valve inspection schedule with a maximum valve inspection interval of 1 year, not to exceed 15 months.