Official US Government Icon

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure Site Icon

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Final rule.

The FAA is adopting a new airworthiness directive (AD) for certain General Electric Company (GE) GE90-76B, GE90-85B, GE90-90B, and GE90-94B model turbofan engines. This AD was prompted by a commanded in-flight shutdown (IFSD) due to cracking and rockback of the high- pressure turbine (HPT) stage 2 nozzles resulting in blade liberation, severe rotor imbalance, and liberation of the exhaust centerbody. This AD requires initial and repetitive borescope inspections (BSIs) of the forward platforms of the HPT stage 2 blades or the leading edges of the HPT stage 2 nozzles and, depending on the results of the inspections, removal and replacement of the HPT stage 2 nozzles with parts eligible for installation. As a mandatory terminating action to the repetitive BSIs of the forward platforms of the HPT stage 2 blades or the leading edges of the HPT stage 2 nozzles, this AD requires replacing the HPT stage 2 nozzles. The FAA is issuing this AD to address the unsafe condition on these products.

View PDF