Action
Final rule.
Summary
We are adopting a new airworthiness directive (AD) for all General Electric Company (GE) CF6-80A, -80A1, -80A2, and -80A3 turbofan engines. This AD was prompted by high cycle fatigue (HCF) cracking of the low-pressure turbine (LPT) stage 3 nozzles. This AD requires replacement of the LPT stage 3 nozzles, part numbers (P/Ns) 9290M52P05 and 9290M52P06, installed. We are issuing this AD to address the unsafe condition on these products.