Action
Notice of proposed rulemaking (NPRM).
Summary
We propose to adopt a new airworthiness directive (AD) for all General Electric Company (GE) GE90-76B, GE90-77B, GE90-85B, GE90-90B, and GE90-94B turbofan engines with high-pressure compressor (HPC) stage 8-10 spool, part numbers (P/Ns) 1694M80G04, 1844M90G01, or 1844M90G02, installed. This proposed AD was prompted by reports of cracks found on the seal teeth of the HPC stage 8-10 spool. This proposed AD would require eddy current inspections (ECIs) or fluorescent penetrant inspections (FPIs) of the HPC stage 8-10 spool seal teeth and removing from service those parts that fail inspection. We are proposing this AD to prevent failure of the HPC stage 8-10 spool, uncontained rotor release, damage to the engine, and damage to the airplane.