Action
Final rule.
Summary
We are revising airworthiness directive (AD) 2008-21-07 for certain Dowty Propellers model R408/6-123-F/17 propellers. AD 2008-21- 07 required initial and repetitive inspections of the blade bonded metallic leading edge (L/E) guards for correct bonding until they accumulate more than 1,200 flight hours (FH) time-in-service. This AD requires the same inspection and replacement requirements of AD 2008- 21-07. This AD also provides an optional terminating action to those requirements. This AD was prompted by updated service bulletins that identify terminating action to the requirements of AD 2008-21-07. We are issuing this AD to prevent the loss of the bonded metallic L/E guard of the propeller, which could result in damage to the propeller or to the airplane, or injury to personnel.