Procurement Forecast Opportunity-474836-2024-229

This 2.7-mile project includes a new asphalt road surface, subsurface strengthening, re-grading culvert inlets and outlets, large box culvert installations, thin epoxy overlay, signing, striping and erosion and sediment control. 

Procurement Forecast Opportunity-474791-OST-X20-2024-01

Procure logistics services including international events management, travel arrangement, foreign language interpretation and translation, professional production and design, and subject matter expertise in cities across the globe in regions such as Asia-Pacific, Latin America, Europe, and in the United States.

Procurement Forecast Opportunity-474636-2025-015

This work consists of activities prescribed under the ERFO program, including earthwork, subgrade, road base reconstruction, embankment reconstruction, slope construction, and drainage infrastructure.  Project location is near Randle, WA in the Gifford Pinchot National Forest.

Procurement Forecast Opportunity-474411-2025-014

Project NP SER PMS FY24(1) consists of pavement preservation of park roads and parking areas in Canaveral National Seashore. The Scope of Work consists of pavement treatment (e.g. micro-surfacing, thin-lift, SAMI, etc.), asphalt patching, crack cleaning and sealing, pavement marking, and other miscellaneous work. The project is located in Brevard and Volusia Counties in Florida.

Procurement Forecast Opportunity-474351-2025-013

Project VA NP GWMP MVT(4) is design-build work that consists of reconstructing approximately seven miles of trail. The work includes grading; aggregate base; asphalt pavement; replacing timber bridges; rehabilitating concrete bridges; drainage improvements; pedestrian safety improvements (signage and stripping); retaining walls; and trail realignment. The work will incorporate reconstruction designs of the trail; design and implementation of a Transportation Management Plan; temporary trail user controls; detours; and other miscellaneous work.