Procurement Forecast Opportunity-673011-2025-054
Repair/repave mainline road section 1k MP 87.5 - 89.0
Repair/repave mainline road section 1k MP 87.5 - 89.0
The project is located in Bedford, Scott, Tazewell, and Wythe Counties, VA. The work includes geotechnical slide repairs; bridge scour repairs; culvert repairs, replacements, and installation; replacement of timber bridge low water crossing; riprap installation, and other miscellaneous work.
Work includes removing the existing bridge, constructing a new bridge, grading, aggregate surface course, and other miscellaneous work.
The scope of the project is preventative maintenance/pavement preservation to extend the life of the pavement and to lower the actual life cycle cost. This project is to place 1.375-inch overlay on the main park road, parking areas, and all connecting and intersecting routes.
Signa and Safety Repairs in the Metro, North, and South Regions.
Project PR ER DOT PRMNT RPR (25) consists of landslide repairs damaged by Hurricanes Irma and Maria on the West Region.
Landslide Repairs in the North and South Region C2.
Project PR ER DOT PRMNT RPR (16) consists of repairing signs and guardrails damaged by Hurricanes Irma and Maria on the West Region.
The scope of work consists of pavement preservation treatment (Micro-surfacing, Micro-seal, Thin-lift, etc), asphalt patching, crack cleaning and sealing, pavement marking, and other miscellaneous work on the identified paved roads and parking areas.
The project consists of providing permanent repairs and stabilization at 3 fill slope locations along Blue Ridge Parkway, at MP 347.