TRANServe Customer Conference 2018
2018 Customer Conference
2018 Customer Conference
March 2018 Significant Rulemaking Report
For more than two decades the industry has used prefabricated road and bridge elements, known as “accelerated bridge construction,” to improve worker safety, overall quality, and reduce inconvenience to the public. The use of prefabricated building elements and components is widespread...
On March 15, a 174-foot-long, 950-ton pedestrian bridge connecting Florida International University (FIU) to Sweetwater, Florida, collapsed during its construction. The National Transportation Safety Board (NTSB) is currently investigating the cause of the collapse. The U.S. Department of...