Procurement Forecast Opportunity-673776-
This project includes the full depth reclamation and repaving of the asphalt parking lot at Building 270 and the re-painting of all disturbed and removed parking lot pavement markings.
This project includes the full depth reclamation and repaving of the asphalt parking lot at Building 270 and the re-painting of all disturbed and removed parking lot pavement markings.
This project includes demolition of existing 69kV yard structures and foundations and installation of new 20 MVA transformers and underground feeders.
Life cycle replacement of Building 210 boiler
Replace underground emergency electrical feeder from Building 303 to Building 300.
Refurbish Fire Alarm system and Electrical system
Repair electrical and fire protection systems
Refurbish ARSR Steel Tower and Building Exterior
Replace interior construction and interior finishes at the QHA ARSR
Repair electrical equipment, lighting, and grounding.
Building and exterior activities to correct water damage, prevent water intrusion.