This action is to purchase a new backup and recovery system for the US DOTs Volpe Center Via NASA SEWP. Volpe intends to procure the following as part of this backup : CommVault Software Subscription VM Advanced Backup- Qty.- 223
CommVault Software Subscription Physical backup- Qty.-81;
Datastor Accelerator Bundle- on-site installation services- Qty.-1
CommVault Training Units- Qty.-60
Dell PowerEdge R650 server Qty.-2;
6.4T.B Enterprise NVMe, Mixed use U.2 Gen4 with carrier Qty.-4;
The purpose of this requirement is to procure crash analysis expertise to supplement the Volpe Center’s Safety Measurement and Analysis Division’s support to operation of the Federal Motor Carrier Safety Administration (FMCSA)’s Crash Preventability Determination Program (CPDP) and support expanded program operations. Activities include: reviewing crashes for program eligibility and preventability based on program standards, engaging with the Volpe Center to identify areas for continuous improvement, and attending team meetings and training events.
GLS has a potable water treatment plant and 4 wastewater systems that are critical in providing clean water and disposing of waste at the facility. GLS is seeking a qualified third-party Contractor to complete the operation and testing of these systems as regulated by the governing agencies.
This requirement will consist of a 12-month base year and four 12-month option years.
GLS has a requirement to purchase new trapezoidal rubber fenders with mounting hardware is to replace the existing fendering on the Lock walls that have begun to show signs of wear and deterioration over time. Replacing worn timber fendering with new rubber fendering better protects the ships and GLS’s infrastructure from damage.
The construction of a one-story office building The construction will be in accordance with issued for construction drawings and specifications and will include reinforced concrete foundations, structural steel framing and masonry work. This project also includes all utilities; communications; site improvements; pavements; electrical systems; heating, ventilation, and air conditioning systems (HVAC); fire detection and protection features; security enhancements; and other supporting work necessary to make a complete and usable facility.
ESTABLISH (IIJA) 25000310 Env. Cleanup Project HNL IFST, AOC#1 (RA), OAHU SSC, WSA, WSA ENGINEERING SERVICES
REPLACE IIJA Locally Implemented Shelter (IDAB NASEB), TETON SSC, WSA, WSA ENGINEERING SERVICES
REPLACE MALSR Home Run VisAid Cables 23003379, @ GDI (T1), LaGuardia Airport RWY 13, Flushing, NY, LAGUARDIA ENV SSC, ESA, ESA ENGINEERING SERVICES
REPLACE JCN 22003864 ELD Site Survey/Design at OLD ELD OLD TOWN ME, BANGOR SSC, ESA, ESA ENGINEERING SERVICES