News Archive
2017 Employee Viewpoint Survey Results
This document summarizes the results of the 2017 Employee Viewpoint Survey. A summary narrative is included as well as tables with a question-by-question breakdown of the results.
DOT 5 Panel Notice
DOT Drug Testing: After January 1, 2018 – Still a 5-Panel
The DOT testing at HHS-certified laboratories is a 5-panel drug test regimen. As of January 1, 2018, the ‘...
Induction of President Ronald Reagan Into The Labor Hall of Honor
Remarks Prepared For Delivery By
U.S. Secretary of Transportation Elaine L. Chao
Induction of President Ronald Reagan Into
The Labor Hall of Honor
Frances Perkins...
NACo Legislative Conference 2018
GPS Adjacent Band Compatibility Assessment Workshop II
December 4, 2014
AGENDA |
---|
Building a Stronger America
The quality of America’s infrastructure is a measure of its greatness. For too long, many infrastructure projects throughout the country have been limited by a complex permitting process and...
ABC Workshop III: Attendee List
Maqbool Aliani, LightSquared
Nathan Anderson, MnDOT
James Arnold, USDOT
Alberto Arredondo, Aerospace Corp.
Jeffrey Auerbach, Department of State
Elliott ...
GPS Innovation Alliance (GPSIA) Comments on DOT Proposed Testing Requirements - Workshop III
Cover Letter
April 14, 2015
VIA E-MAIL
Mr. Stephen M. Mackey
Electronics Engineer
Aircraft Wakes and Weather Division (V-345)
Volpe, The National...
LightSquared Comments for Adjacent Band Compatibility Study
April 20, 2015
Via Overnight Express and Electronic Mail
Ms. Karen Van Dyke
Director, Office of Positioning, Navigation
and Timing and Spectrum Management...