Official US Government Icon

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure Site Icon

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

U.S. Secretary of Transportation Elaine L. Chao Announces $291 Million in ‘State of Good Repair’ Grants to Improve the Reliability and Safety of America’s Rail Network

Wednesday, October 28, 2020

WASHINGTON – U.S. Secretary of Transportation Elaine L. Chao today announced an investment of more than $291 million in grants for 11 intercity passenger rail projects in nine states through the Federal-State Partnership for State of Good Repair Program (Partnership Program). 

“This $291 million in federal grants will upgrade rail infrastructure and enhance railroad safety and reliability in communities across America,” said U.S. Transportation Secretary Elaine L. Chao.
 
The Partnership Program is intended to improve intercity passenger rail performance by funding capital projects to repair, replace or rehabilitate publicly owned or controlled railroad assets, thereby bringing them into a state of good repair. Funding for these awards totals $291,422,706, with $198 million made available from the Further Consolidated Appropriations Act of 2020 and $93,422,706 in remaining funds made available through the Consolidated Appropriations Act of 2019. 

FRA published a Notice of Funding Opportunity for this award cycle on June 10, 2020. The evaluation and selection process considered several factors in choosing projects, including the project’s abilities to improve service and safety and to meet existing or anticipated demand.

 “This Administration has invested billions in railroad infrastructure to ensure the safe movement of passengers and goods throughout our nation,” FRA Administrator Ronald L. Batory said. “These investments have proven vital during this challenging year and kept essential supplies moving throughout our nation, and these State of Good Repair grants will continue those improvements and enhance passenger rail service to ready the nation for the forthcoming recovery,” Batory added.  

The following 11 projects were selected. Project descriptions are available on FRA’s website.

California — San Diego Next Generation Signaling and Grade Crossing Modernization
Up to $9,836,917
North County Transit District

California — Pacific Surfliner Corridor Rehabilitation and Service Reliability
Up to $31,800,000
Southern California Regional Rail Authority

Connecticut — Walk Bridge Replacement
Up to $79,700,000
Connecticut Department of Transportation

Connecticut — Connecticut River Bridge Replacement
Up to $65,200,799
Amtrak 

Massachusetts —  Worcester Union Station Accessibility and Infrastructure Improvements 
Up to $29,303,350
Massachusetts Bay Transportation Authority

Maryland — MARC Northeast Corridor Train Storage Preservation Project
Up to $9,400,000
Maryland Transit Administration

Michigan — Ypsilanti to Jackson Curve Modifications
Up to $15,570,327
Michigan Department of Transportation

New Jersey — Trenton Transit Center Station Improvements
Up to $18,281,313
New Jersey Transit Corporation 

New York — Hudson Avenue Grade Crossing Rehabilitation and Safety Improvements
Up to $2,000,000
New York State Department of Transportation

Pennsylvania —  Harrisburg Line Signal System Renewal: Paoli to Overbrook
Up to $15,910,000
Southeastern Pennsylvania Transportation Authority

Virginia — Newington Road Bridge Replacement
Up to $14,420,000
Virginia Department of Rail and Public Transportation

 

California — San Diego Next Generation Signaling and Grade Crossing Modernization
Up to $9,836,917
North County Transit District

Replaces and upgrades obsolete signal, train control, and crossing equipment on a 60-mile section of North County Transit District right-of-way the carrier shares with Amtrak intercity service and freight rail. Brings signal and train control components into a state of good repair, including installing new signal houses, signals and cabling. Replaces components at more than 15 grade crossings along the corridor.

California — Pacific Surfliner Corridor Rehabilitation and Service Reliability
Up to $31,800,000
Southern California Regional Rail Authority

Rehabilitates track, structures, and grade crossings in Ventura County and northern Los Angeles County on infrastructure used by Amtrak intercity service, Metrolink commuter service, and BNSF freight service. Work for member agency Ventura County Transportation Commission includes track, tie, ballast, and culvert replacements, grade crossing rehabilitation, and tunnel track and structure replacements. Reduces trip times, increases reliability, and improves safety by reducing need for slow orders and conflicts at grade crossings in the corridor.

Connecticut — Walk Bridge Replacement
Up to $79,700,000
Connecticut Department of Transportation & Amtrak

Replaces the Connecticut-owned movable Norwalk River Bridge, built in 1896, with two, independent, two-track, vertical lift rail bridges in Norwalk, Connecticut. Includes associated embankment and retaining wall improvements on the bridge approaches, new catenary structures, and signal system upgrades. The existing bridge is beyond its useful life and prone to malfunctions, especially during opening or closing. The replacement will reduce slow orders, reduce the risk of service disruptions, and improve resiliency to extreme weather events. The project is a regional priority in the Northeast Corridor Commission's five-year capital plan. The current award is in addition to the $29.9 million previously awarded in fiscal year 2019 Partnership Program funds, and completes the project. The Federal Transit Administration formula and Hurricane Sandy Relief funds provide additional funding.

Connecticut — Connecticut River Bridge Replacement
Up to $65,200,799
Amtrak & Connecticut Department of Transportation

Replaces the Connecticut River Bridge with a modern, resilient, moveable bridge immediately south of the existing structure. The existing Amtrak-owned, 113-year-old bridge poses a risk of long-term major disruption on the Northeast Corridor due to its age and condition. The replacement bridge will maintain the two-track configuration and existing channel location, and provide a bascule moveable span with additional vertical clearance for maritime traffic. The bridge serves the Northeast Corridor main line and is used by Amtrak’s intercity services, Connecticut Shore Line East commuter service, and freight operators. The project will provide safety, reliability, and trip-time improvements for rail users. Maximum speeds will increase from 45 mph to 70 mph. Bridge opening delays will be significantly reduced, and Amtrak will realize maintenance savings from the new structure.

Massachusetts — Worcester Union Station Accessibility and Infrastructure Improvements 
Up to $29,303,350
Massachusetts Bay Transportation Authority

 
Rehabilitates and upgrades the platform and track area of Worcester Union Station, constructing a new island platform with grade-separated pedestrian access to replace a single side platform, plus associated rehabilitation of two station tracks and signals. The new, 800-foot-long, high-level platform will provide full Americans with Disabilities Act accessibility and enable multiple trains to stop at Worcester simultaneously. Project improvements will be owned by Massachusetts Bay Transportation Authority (MBTA). The project will expand the station’s capacity to serve MBTA commuter services and current and potential future Amtrak intercity service. The upgrades will improve reliability and reduce delays and operational conflicts created by the constrained, single-side platform that cannot easily serve trains moving in opposite directions.

Maryland — MARC Northeast Corridor Train Storage Preservation Project
Up to $9,400,000
Maryland Transit Administration

Constructs two storage tracks with catenary and ground power access at Martin's Yard. The expanded yard will store MARC Penn Line trainsets now stored on platform tracks at Baltimore Penn Station. Currently, Baltimore Penn Station does not operate at a state of good repair because train storage constrains capacity and efficiency. The improvements will bring the yard into a state of good repair and advance the state of good repair at Baltimore Penn Station. Reducing train storage at Baltimore Penn Station will expand station capacity and reduce delays from interference between trains, including intercity passenger rail operations, that meet and pass each other in Baltimore, benefiting both Amtrak’s intercity Northeast Corridor services and MARC Penn Line commuter services.

Michigan — Ypsilanti to Jackson Curve Modifications
Up to $15,570,327
Michigan Department of Transportation

Rehabilitates and improves geometry for 42 horizontal curves, installing approximately 80,000 feet of rail and related safety enhancements at 16 public and 8 private at-grade crossings, including roadway vertical profile changes and active warning device installation on the state-owned rail corridor between Ypsilanti and Jackson, Michigan. Expected to provide a 7-minute trip-time reduction and improve operational reliability and grade crossing safety throughout the corridor.

New Jersey — Trenton Transit Center Station Improvements
Up to $18,281,313
New Jersey Transit Corporation 

Rehabilitates two island platforms and upgrades a side platform to high-level boarding, remediating existing platforms’ deteriorated conditions and expanding station capacity at the Trenton Transit Center. The station serves Amtrak intercity train services and New Jersey Transit commuter service. Project improves the safety and accessibility of the boarding environment, including full ADA compliance at all platforms at the station. The platforms, canopies, and vertical circulation elements being rehabilitated were rated adequate to poor in the applicant’s most recent assessment.

New York — Hudson Avenue Grade Crossing Rehabilitation and Safety Improvements
Up to $2,000,000
New York State Department of Transportation

Replaces and upgrades crossing warning devices and adds accessible pedestrian walkways and gates at the Hudson Avenue grade crossing in Peekskill, New York, on Metro-North's Hudson Line, which serves Amtrak intercity service, Metro-North commuter service, and freight rail. Replaces the 40-year-old warning system and crossing gates with modernized components, including an “another train coming” warning at this busy, double-track corridor. All rail operators along the corridor will benefit from improved crossing safety and elimination of delays the current warning device malfunctions cause. Project significantly improves safety and access to Peekskill Station and an adjacent city park.

Pennsylvania —  Harrisburg Line Signal System Renewal: Paoli to Overbrook
Up to $15,910,000
Southeastern Pennsylvania Transportation Authority (SEPTA), Amtrak and Pennsylvania Department of Transportation

Replaces and upgrades train control signal systems to a state of good repair between Paoli and Overbook on the Amtrak-owned Harrisburg Line in Pennsylvania. The line serves Amtrak intercity service, SEPTA commuter service, and freight rail. Project replaces antiquated signal system with modernized equipment, enabling greater operational flexibility, higher operating speeds, and bi-directional train movement on all tracks in the project area. Increases signal blocks, enhancing line capacity and operational fluidity while reducing delays.

Virginia — Newington Road Bridge Replacement
Up to $14,420,000
Virginia Department of Rail and Public Transportation

Replaces an existing double-track rail bridge owned by CSX with two new double-track rail bridges to be owned separately by CSX and the Commonwealth of Virginia, expanding passenger rail capacity in the Washington, D.C., to Richmond, Virginia, corridor. The corridor serves Amtrak intercity service, Virginia Railway Express commuter service, and freight rail.  The existing bridge is over a century old, is not in a state of good repair and spans a single-lane roadway, which will be widened to a two-lane roadway with standard vertical and horizontal clearances as part of the project. Additionally, the new spans will eliminate slow orders related to the bridge condition and allow for 60-70 mph operating speeds. The Partnership Program funding to support the Virginia-owned bridge is part of an effort to bring the corridor into a state of good repair and create additional capacity. A separate double-track rail bridge owned by CSX is planned outside the scope of this award, which will serve and enable future growth in passenger service in the corridor.

###